Featured Philippine Ports: Batangas Port


Batangas Port

copyright: mcgutib

BATANGAS

Better known as the “Industrial Port City”,  Batangas is one of the fastest growing economy in CALABARZON province-an export driven industrial development region that stimulated the growth of shipping activities in Batangas Port. Bordered by the Province of Cavite and Laguna to the north; Quezon Province to the east, crossing Verde Island Passage to the south is Mindoro, and to the west is the West Philippine Sea. It’s capital is Batangas City.

Long before the arrival of the Spaniards in the country, large communities are already settled along the Pansipit River- a navigable channel (it used to be- that is before Taal volcano’s eruption in 18th century) connecting Taal Lake to Balayan Bay. These community have been engaging trades with Japanese during Muromachi period, and Chinese traders since the Ming Dynasty in the 13th and 15th century.

The first Spanish missionaries arrived in 1572, later on in 1581 a settlement was established and named it “Batangan”  because of the numerous big logs that were seen at Calumpang river. The logs by the way were named “batang” by people settled near the river, and later on the word batang were replaced and it became Batangas in 1601.

On 21st of June 1969, the late President Ferdinand Marcos signed a law (Republic Act No. 5495) creating Batangas a City. On 23rd of July 1969, Batangas City government was formally established.

Batangas City is approximately 112 kilometers southwest of Manila. Batangas Port (declared as a national port in 1956) on the other hand, is located in Barangay Sta. Clara, about two kilometers from the city proper; and situated in the northeastern part of Batangas bay, a strategic site for the development of port facilities. The bay area has a 180 square kilometers of body of sea while the mouth of the bay is approximately 16 kilometers across, and is well-protected by Mindoro, Maricaban Island, and Calumpan Peninsula. Batangas Bay has a steep underwater slope, thus for the most part the bay is calm and deep perfect for large ocean going vessel to anchor near the shoreline.

PORT OF ENTRY:  Port of Batangas

This ISO 9001:2008 certified port was first constructed in the middle of 1930’s, its facilities were utilized as the entry/exit for people and products going to and from the Province of Mindoro, Marinduque, Romblon, and Palawan (MIMAROPA). More importantly, Port of Batangas served as the strategic shipping venue for all industries in the areas of Cavite, Laguna, Batangas, Rizal, and Quezon (CALABARZON-as it was popularly known).

The port facilitates the transport link by land and sea routes using inter-modal buses, ro-ro/lo-lo vessels, motorized out-rigger boats, and mono-hauled/trimaran fastcraft (introduced in 1995) within the Ports of Calapan, Puerto Galera, and Abra de Ilog in Oriental Mindoro. It also links the west coast ports of San Jose and Sablayan in Occidental Mindoro, Ports in Sta. Cruz and Balanacan in the province of Mariduque, Port of Romblon and Odiongan; so does the Port of Coron in Busuanga Island, and major Ports in Cebu, Iloilo, and Cagayan de Oro as well.

Batangas Port form part of Port Authority’s Strong Republic’s Nautical Highway (SRNH) project bridging the island of Luzon, Visayas, and Mindanao in an extensive network of highways and ro-ro inter-connectivity. Western Nautical Highway is composed of RORO Ports linking between:

– Batangas City and Calapan City, Oriental Mindoro;

Roxas, Oriental Mindoro and Caticlan, Aklan;

Dumangas Port, Iloilo  and BREDCO Port, Bacolod City ;

Dumaguete City, Negros Oriental and Dapitan City, Zamboanga del Norte.

Batangas Port ferry schedules and fare, click here: RORO/FERRY 2015 Schedule

How to get here?

Ceres Bus at Batangas Port

Ceres Bus at Batangas Port

Port of Batangas is strategically located on the northeastern section of Batangas Bay along the southwestern part of Luzon. The port is about three to four hours away from Manila’s business and commercial district via South Luzon Expressway (SLEX) which then connects to Southern Tagalog Arterial Road (Star Tollway), and its extension  Alabang -Calamba-Sto. Tomas Toll Expressway (ACTEX).  Bus lines like the RRCG, Ceres Transport, Alps Express, JAM Trans, Supreme Transit Liner Inc., DLTB Co., N. de la Rosa Transit, and Batangas Star Express are amongst competing on this route. You may be familiar with their dashboard signage:

  1. Buendia/Taft-Batangas Pier
  2. Cubao-Batangas Pier
  3. Taft/Pasay-Batangas Pier
  4. Lawton-Batangas Pier
  5. Ortigas-Batangas Pier
  6. Alabang-Batangas Pier

Pre -Development Stage

Batangas Port started its roll on-roll off operation to Mindoro Province in 1981. And by 1994, the volume of  sea-going passengers heading to Calapan, Puerto Galera, and Abra de ilog steadily increased due to influx of vacationers and local tourist during holidays and weekends to take advantage of beautiful sand beach, and breathtaking sceneries that offer leisure and relaxation. Passenger traffic among  various shipping liner with connections to Mindoro’s west coast ports of San Jose and Sablayan, Romblon’s Odiongan and Tablas Port, so does Coron Port in Busuanga Island, have all been picking up its pace in succeeding years thus competing to giant inter-island shipping companies which offers  Manila direct route.

Due to the congestion and over-capacity of Port of Manila in the early years, government agency planners seek alternative ports to address these issues. A major opportunity for development of Batangas Port were then foreseen because of the fact that it sits on a strategic location-which is near proximity to the thriving economic zone of CALABARZON region, the Agri-Marine products of  MIMAROPA, and the growing economies of the provinces in Vis-Min region. It has been established that vessels sailing from major ports of origin around the Visayas and Mindanao area, would likely save fuel and time if it chooses  Batangas Port rather than the usual North or South Harbor as their port of destination, the reason behind it is because sailing to North harbor for example add six hours more; sailing in both the northward and southward direction will cost more fuel and precious time (approximately 12 hours turn around).

Batangas Port then was once considered one of the two most underdeveloped ports in the country (the other is port of Cebu), and  already struggling to accommodate rolling cargo traffic and large number of domestic vessels. Existing port facilities then are “cramped and dilapidated making orderly and efficient operation impossible” (5). The Port itself cannot meet the necessities needed for tourist/passenger’s convenience especially during peak season, thus contributed to the inefficiency in shipping services.

The Port neither had any berth specifically built for ro-ro vessel, thus limiting ferry operators to three companies. It was customary then for a ferry vessel to remain at berth even past their scheduled departure time just waiting to fill all the vacant spaces with vehicles and passengers, forcing the next vessel in-line to wait for more hours for their turn.

In 1981, a preliminary study were made by Philippine Ports Authority (PPA), instituting a plan to relieved Manila’s premier ports of portions of the international and domestic liner shipping trade. A major development project was formed together with the National Economic and Development Authority (NEDA), and is considered to be one of the anchor projects for the Cavite-Laguna-Batangas-Rizal-Quezon regional development program. It aimed to:

i). Improved the function as the access point to Mindoro Island: To promote the supplies and distribution of agricultural products from Mindoro to Southern Tagalog Region, thereby contributing to the development of Mindoro Island.

ii). Function as a hub port contributing to the economic development of its hinterlands: To stimulate the regional economic development of the Southern Tagalog Region, the industrial heartland of the Philippines.

(iii). Functions relating to the National Capital Region: As a second port to supplement Manila Port’s North and South harbor where traffic congestion is worsening.

In 1984, the Batangas Port Expansion Program were formulated by the Philippine Government and Japanese International Cooperation Agency (JICA).

On December of 1985, a feasibility study were conducted for the Development Project of Batangas Port (known as Batangas Port Study). It was initiated by Japan International Cooperation Agency (JICA), upon the request from Philippine government and it became the basis for a loan from Japan’s Overseas Economic Cooperation Fund (OECF)  for the construction of Phases 1 and Phase 2 project. Within the feasibility study, the development plans were divided between short-term and long-term elements.

Executive Order No. 385, issued by then former President Corazon Aquino on the 19th of December 1989 delineated the territorial jurisdiction of the Port of Batangas, an important moved to increased its land use for future expansion. But it also raises future tensions, problems, issues, resulting to court battles between affected land owners/settlers on the affected community, and government implementing agencies. Issues such as land ownership, forced-eviction, compensation, re-settlement, so on and so forth.

Department of Transportation and Communication likewise were given a task to prepare a National Port Transport Plan to address regional development needs, and comply with the privatization program integrating an inter-modal transport network that would link road, rail, sea, and air transport systems efficiently. Executive Order Nos. 212, paves the way for the deregulation of all government ports in the country.

Batangas Port Development Project (BPDP) of the Philippine Ports Authority was one of the major flagship programs of Philippines 2000, the development plan of then President Fidel Ramos Administration in its bid for a globally competitive economy.

Facilities of Batangas Port before the implementation BPDP

Facilities Size

Size

Use

Status

Construction Date

Pier I Length 135mtrs.Width 15mtrs.Water Depth 6mtrs. Shared between Ro-Ro and general cargo vessel

Under repair

(from typhoon damage)

1940’s

Pier II Length 48mtrs.Width 12mtrs.Depth 4mtrs.

Shared between Ro-Ro and general cargo vessel

Extremely dilapidated

1971

Pier III Length 85mtrs.Width 15mtrs.Depth 2.67mtrs.

Inner side for ship repair, outer side for barge mooring

Extremely dilapidated

1971

Parallel wharves  Length 93mtr.Width 15mtrs.Depth 7.5mtrs.

General cargo vessels (domestic and foreign)

Wharf entrance

congested with cargo vehicles

1972

Land for Portfacilities

2.6 ha

Offices, customs house, passenger terminal, parking space

Cramped and crowded with vehicles,passengers and cargo.

N.A

Vessels serving Batangas Port  in 1994 (MARINA franchised)

OPERATOR/NAME OF VESSEL

TYPE OF VESSEL

ROUTE

AC SHIPPING LINES. CO.

 

M/VPRINCESS AC – IV

PAX-FERRY

PGalera -BTGS-PGalera

MB QUEEN AC -II

PAX-FERRY

PGalera -BTGS-TGLY-BTGS – PGalera

MB PRINCESS AC-VI

PAX-FERRY

PGAL -PISA-TGLY-BTGS- TGLY-PISA-PGAL

 

BERNARDO ATIENZA

 

MB AC-1

PAX-FERRY

PGAL-BTGS-PGAL

 

MONTENEGRO SHIPPING LINES

 

MB DON VICENTE

PAX-FERRY

BTGS-ABRA DE ILOG-BTGS

MB DONA MATILDE

PAX-FERRY

BTGS- ABRA DE ILOG -BTGS

MB DON FRANCISCO

PAX-FERRY

BTGS- ABRA DE ILOG -BTGS

 

SI-KAT FERRIES INC.

 

MB SI-KAT II

PAX-FERRY

PGALERA-BTGS-PGALERA

 

VIVA SHIPPING LINES

 

M/V VIVA PENAFRANCIA II

PAX-FERRY

BTGS-BUAN-GSAN-ODIO-LOOC-SAGU-ROMBON-SAGU-LOOC-ODIO-GSAN-BUAN-BTGS

M/V LADY OF LOURDES

PAX-FERRY

BTGS-CLPN-BTGS

M/V VIVA PENAFRANCIA IV

PAX-FERRY

BTGS-CLPN-BTGS

M/V VIVA PENAFRANCIA VI

PAX-FERRY

BTGS-CLPN-BTGS

M/V VIVA PENAFRANCIA IX

PAX-FERRY

BTGS-CLPN-BTGS

M/V VIVA STA ANA

PAX-FERRY

BTGS–SANJOSE-BTGS

Post-Development Stage

Batangas Domestic Cargo Berth

Batangas Domestic Cargo Berth

Phase 1 Project

Domestic area project correspond to the short term portion of Batangas Port Development Plan’s overall plan, and aimed on improving, and expanding the cramped and inadequate facilities of the Port- so that movement of passengers, vehicles, cargoes, and roll-0n-and roll-off vessels become more efficient. It was constructed at a cost of P1.60 billion under the 17th Overseas Economic Cooperation Fund (OECF). Completed on march of 1999, three years and seven months behind scheduled completion date of august of 1995. Their new and modern facility includes:

A total berthing capacity of 16 berths with controlling water depth of between 5 to 10 meters, ready to serve at at any given time;

It has a modest capacity to accommodate 11 RORO vessels (six roll-on/roll-off ramp at 680 meters in total length);

It has seven berths for high speed ferries of 540 meters in total length;

and two berthing facilities for cargo vessels of 200 meters in length.

Three fully Air-conditioned Passenger Terminal Buildings (PTB’s) capable of handling three million embarking passengers annually.

A range of modern cargo handling equipment including quay cranes and forklifts are available. A computerized cargo tracking system is also being used.

Storage warehouses, reefer vans, maintenance shop, power and pump houses;

A 25,000 sq. meters of marshalling yard;

It has a total land area of 206,349 square meters.

Batangas VTMS Radar Station 2

Batangas VTMS Radar Station 2

For passenger safety, vessel security, and traffic monitoring along the harbor, baseport Batangas installed a total port security system; this includes vessel traffic management system or VTMS (manned by coast guard personnel). Crowd monitoring system, Gate management system, Mobile x-ray scanning machine, and Harbor patrol craft.

Changes in fastcraft  operation between Batangas and Calapan

 

1997

(Before completion of the project)

1998

 (After completion of the project)

Number of specialized berths

0

7

Number of ferry operators

2

3

Round trips for ferry/day

3-6

4-7

Number of vessels

7

7

Crossing time (Batangas ~ Calapan)

45 mins.

45 mins.

Number of departures per day

32

35

First and last departures from Batangas

5:00 am/6:30 pm

4:45 am/6:30 pm

Changes in Ro-Ro vessel operation between Batangas  and Calapan

 

1997

 (Before completion of the project)

1998

 (After completion of the project)

Number of specialized berths

0

6

Number of ferry operators

3

8

Round trips for ferry/day

2

3

Number of vessels

10

18

Average vessel GT

480GT

590GT

Crossing time (Batangas ~ Calapan)

2-3 H

2-3H

Number of departures per day from

24

52

First and last departures from Batangas Port

1 am-9 pm

12:30 am/11:30 pm

Phase II Project

Batangas Port Development Plan Phase II project represent the long-term plan for Batangas Port. Costing three billion pesos,  it sits on 128 hectare expanded area specifically built for large-scale cargo handling, with capacity to handle foreign/domestic cargoes at 4.34 million tons per year (in 2005); to which it could promote its functions as a supplementary port for Manila. It was planned to serve not only the Visayas-Mindanao region, but design to meet the demands of growing trade, and commerce between the countries in the ASEAN region. The Phase II loan agreement was signed on March 1997; assisted by five and a half billion pesos loan grant from Japan Bank of International Cooperation (JBIC). It was inaugurated on January 19, 2008, two months ahead of the scheduled completion.

Phase II Project is subdivided into Packages 1, 2 and 3 namely:

Package 1 are civil and marine works; it includes container terminal and handling equipment instillation (estimated cost of P1.06 billion), general cargo berth, dredging, and reclamation works, building construction and support facilities.

Boarding bridge

One of five boarding bridges installed in Batangas Port.

 Package 2 on the other hand, are construction of five boarding bridges and elevated walkways were completed.

 Package 3, better known as Arterial Road Links Development Project is a port access and flyover construction. These includes the P1.5-billion Southern Tagalog Arterial Road (STAR) projects, and the South Luzon Expressway (SLEX) road widening and expansion project.

Batangas Port Management

Philippine Ports Authority (PPA) is a government-owned corporation attached to the Department of Transportation and Communication (DOTC). It was created by virtue of Presidential Decree (PD) No. 505 dated 11 July 1974, its functions are to coordinate, streamline, improve and optimize the planning, development, financing, construction, maintenance and operations of ports or port system in the country.

The Port District of South Luzon (PDO-SOLUZ) is one of the five (5) port district offices created in 1988, to promote the de-centralization of authority and pursue local and regional development programs and strategies. The District Office supervises the Port Management Offices (PMO) and likewise serves as their linkage with the Philippine Ports Authority’s head office. PDO Southern Luzon has four (4) management offices in its wing, namely;

  1. PMO Batangas (Baseport)
  2. PMO Calapan
  3. PMO Legazpi
  4. PMO Puerto Princesa

On the other hand, Baseport Batangas has the jurisdiction of the six (6) Terminal offices, namely;

  1. TMO BAUAN   Brgy. Aplaya Bauan, Batangas,
  2. TMO LUCENA  Brgy. Talao-Talao, Lucena City
  3. TMO BALANACAN  San Andres Point, Balanacan Marinduque
  4. TMO STA CRUZ  Marinduque
  5. TMO ODIONGAN  Brgy. Batiano, Odiongan Romblon
  6. TMO ROMBLON  Municipality of Romblon,  Romblon Island

Batangas Port is exclusively operated by Aries Arrastre Services Inc. (subsidiary of Asian Terminals Inc.) with the charges set by PPA,  and a prescribed portion of the profits are paid to the PMO Batangas.

Batangas Port Characteristics

LATITUDE: 13° 45.2′ N
LONGITUDE: 121° 06.6″ E

Navigational Approach From the south, between Motoco Point and Malajibo manok  Islands with an opening of 3 ½ miles, white flashing beacon on Malajibomanok Island Center, duration 0.3 seconds every 10 seconds visible within 8 miles in clear weather. Islands and point can be approached within ½ miles.

Anchorage: The anchorage area is 0.37 km. from shoreline, southwest of the piers with depth of 27.4 to 32.9 meters mud bottom. During southwest monsoon, vessels may anchor off Mabini, Batangas. Good holding grounds off 0.46 km. from the shoreline, with depths of 21.9 to 25.6m. Foreign vessels find good anchorage area southwest of the piers.

Sea Distance:

Batangas to Calapan- approximately 25.65 nautical miles

Batangas to Puerto Galera- approximately 15.47 nautical miles

Batangas to Manila- approximately 92.23 nautical miles (via North of Maricaban Island)

Batangas to Cebu- approximately 303 nautical miles.


 REFERENCES:

1. Batangas Port Development Project

2. http://bulatlat.com/main/2007/02/10/12-years-of-privatization-of-the-port-of-batangas/

3. batangascity.gov.ph
4. Nathan Associates Inc. 1994. Liner Shipping Route Study, Final Report, vols. 1 and 14. Manila: United States Agency for International Development.

5. Dr. Emma Porio, Demolition and Resettlement of Sta. Clara Residents: Policy, Politics, and Personalities in the Batangas Port Development Project. Japan Bank for International Cooperation (JBIC)

6. Myrna S. Austria, 2003. Liberalization and Deregulation in the Domestic Shipping Industry: Effects on Competition and Market Structure.

7. philippines.wikia.com/wiki/Batangas

8. Introduction & summary of Batangas Port presentation by JICA-JCCIPI

9. pdosoluz.com.ph

Featured Philippine Ports: DUMAGUIT PORT


Dumaguit, New Washington

Port of Dumaguit

NEW WASHINGTON, AKLAN

Located in the oldest province in the country, New Washington is one of the municipalities in the Province of Aklan. Formerly called Fonda Lagatik, the name derived from Lagatik river, a tributary stretching more than nine kilometers in length. Established on 15th of January 1904 and was named after President George Washington, the first President of the United States of America as a tribute by Aklanons to the Thomasites.

A mere 20 minutes leisure drive via mass transport from Kalibo City, the town of New Washington is bounded by the Municipalities of Banga and Balete on the west, to the south is Altavas, and in southeast is the Municipality of Batan. The town of Batan by the way is the home of Kalantiaw Shrine  erected  in memory of the third chief of Panay-Rajah Bendahara Kalantiaw the promulgator of the so-called Code of Kalantiaw. (1)

The City of Kalibo the capital of Aklan, is 165 kilometers from the City of Iloilo and can be reached via 3 1/2  hours Ceres transport bus ride (190 pesos for non-aircon). Travel time from Manila North Harbor  to Port of Dumaguit takes around 16 hours.

PORT OF ENTRY: Port of Dumaguit

Dumaguit-Batan Ferry Terminal

Dumaguit-Batan Ferry Terminal

Dumaguit Port is situated along a cove rich in mangroves and fish pens. The entrance channel is distinguishable at night by a two lighthouses, one is at the boundary of Dumaguit in the north and the other is on the eastern boundary of Batan.

The inner basin along Dumaguit-Batan coast are fully protected from rough sea during bad weather, and is considered a natural anchorage for small vessel looking for a shelter during storm. Ships with larger draft are not suitable to drop anchor in the cove because of shallow bed and limited turning area. The Port has a terminal building that houses the Port’s administration office and Passenger boarding facilities. It also has small container yard near the building, and a cargo handling equipment (a lone forklift truck). The entire port can operate at night with their three high mast lights installed inside the premises, and street lamps near the entrance/exit gate. Porters are also available to assist travelers to unload their cargoes from ships. Dumaguit-Batan boat terminal and passenger shed are few meters away from the port’s gate.

During 60’s and 70’s era,  at the height of the Ati-Atihan Festival popularity (as the Philippine Mardi Gras is known) popularity, some foreign and local tourist flock Kalibo town using Dumaguit Port as entry point. Today, the said above port are still preferred by backpackers, and budget conscious travelers who want to see the beauty of the Ati-Atihan Festival which is held every third Sunday of January in Aklan’s capital town of Kalibo. The festival is preceded by several weeks of street dancing and merry-making to the tune of drums in honor of the Sto. Nino or the child Jesus.

Dumaguit Port was once the gateway of the Province of Aklan; that is before Caticlan got its  ro-ro connection between Port of Roxas in Mindoro Occidental, and in Batangas Port via Strong Republic Nautical Highway (SRNH) which were launched by previous administration on April 12, 2003.

There are several vessels that previously serve between Port of Dumaguit and Manila North Harbor during 80’s, 90’s and early 2000’s era. Vessels from Aboitiz Shipping’s M/V El Cano, and M/V Legazpi,  W G & A’s  M/V our Lady of Medjugorje are among the vessels that frequented here. (2)

Shipping and Passenger Statistics for 1998 to 2002 

Particulars

1998

1999

2000

2001

2002

 SHIPCALLS

61

457

441

257

446

 Ave. GRT

5,886.07

5,758.96

5,562.05

6,313.76

5,900.06

       Domestic

5,886.07

5,758.96

5,562.05

6,313.76

5,900.06

       Foreign

0.00

0.00

0.00

0.00

0.00

 Ave. Length (meters.)

116.74

117.45

120.27

120.09

117.90

       Domestic

116.74

117.45

120.27

120.09

117.90

       Foreign

0.00

0.00

0.00

0.00

0.00

 Pax Traffic

36,621

175,717

187,103

100,977

190,751

       Disembarked

22,824

94,019

94,807

54,329

96,108

       Embarked

13,797

81,698

92,296

46,648

94,643

On 25th of October 1999, the then former President Joseph Ejercito Estrada executed an Order (E.O. Nos. 172) declaring and delineating the Dumaguit Port zone under the administrative jurisdiction of the Philippine Ports Authority. Since then the PDO-Visayas/PMO Iloilo oversee the whole operation of the Port of Dumaguit. (4)

Port of Dumaguit is part of the Nautical highway Project covering the Batangas-Caticlan-Dumaguit and Iloilo route, using western nautical corridor’s east coast of Ivatan-Capiz road. The said project was launched by previous administration to boost inter-island Commerce, Trade, Tourism, and Agro-industrial investment opportunities through the use of  land and sea- transports links; taking advantage of the roll-on-roll-off (RORO) network of ferries, and newly constructed/renovated ports totaling 41 sea-ports in a 22 different links. (5)

In 2006, Asia Marine Shipping Lines announces the opening of Batangas-Odiongan, Romblon-Dumaguit route via Super Shuttle Roro 2, a 1769 GT vessel owned by the family of Paul Rodriguez. The said event was graced by the former President herself. (6)

HARBOR FACTS & INFORMATION

Port Location:   Brgy. Dumaguit New Washington, Province of Aklan

Port Name:   TMO Dumaguit

Port Management:  PPA/PDO-Visayas, PMO Iloilo

Address: Brgy. Loboc La Paz, Iloilo City Philippines

Phone:   (033) 337-69-45

Fax:  (033) 337-69-45

Email:   ppailo@philwebinc.com

Web Site:   www.ppa.com.ph

Port Type:   Pier, Jetty or Wharf

Port Size:   Small

Latitude: 11° 35′ 22” N

Longitude: 122° 29′ 20″ E

Total land Area: 276,642.22 sq. meters

SHIPPING SCHEDULE TO/FROM DUMAGUIT

From Batangas (via Odiongan):  Monday, Wednesday, Friday at 3 pm

To Batangas (via Odiongan):  Tuesday, Thursday, Sunday at 12 pm

TRANSPORTATION FARE 

From Batangas vice versa: 750 pesos minimum (Super Shuttle Roro 2)

To Kalibo proper: 20 pesos (Jeep)

To Caticlan Jetty Port via Ceres Bus: 107 pesos (Air-con)

To Iloilo via Ceres Bus: 194 pesos (Non Air-con)

Note: Be advised that the above shipping schedules are no longer in effect, as changes in vessel and shipping operation have seized.


References:

  1. www.wikitravel.org/en/New_Washington
  2. www.asiatour.com
  3.  file:///I:/ILO-DUMAGUIT%20STAT.htm
  4. www.elibrary.judiciary.gov.ph
  5. Socioeconomic Reports on Central Philippines, 7th July 2006 by Sec. Romulo Neri (Secretary of Socioeconomic Planning).
  6. www.batangas.com

Featured Philippine Ports: Caticlan Jetty Port


 

Only in the Philippines

copyright: mcgutib

MALAY, AKLAN

Is one of the two first class municipalities in the Province of Aklan (the other is Kalibo, home of Ati-atihan Festival). It is also in this province you will find the Island of Boracay, the premier tourist destination in the country.

Malay was used to be part of the Municipality of Buruanga,  but on June 15, 1949 the house of congress pass a bill (Republic Act Nos. 381) creating the municipality of Malay in the province of Capiz. On April 25, 1956 the municipality of Malay became part of the newly created province of Aklan. (1)

The town of Malay can be found at the northwestern tips of Panay Island and is known to be the fastest growing Municipality in the country. It is bounded on the north by Jintotolo channel, on the east is the town of Nabas, by the south is the province of Antique, and on the western portion is the town of Buruanga.(2)

PORT OF ENTRY: Caticlan Jetty Port

Caticlan Jetty Port

copyright: mcgutib

Located in Brgy. Caticlan in the town of Malay, is the main entry/exit point to the Island of Boracay. A short 10 to 15  minutes boat ride crossing Tabon strait will bring you to the closest entry/exit point of Cagban Jetty Port (located in the south side facing the strait) in Brgy. Manuk-manukan, Boracay. Whereas Tambisan (facing east), is the alternative entry/exit point during habagat season. Tourism by the way is at its peak during summer season.

Port statistics shows that between January to March of this year, there are 325,000 recorded numbers of tourist visited the Island of Boracay via Caticlan Jetty Port compared to 210,804 on the same month of 2011.

Cagban Jetty Port

copyright: mcgutib

Caticlan Jetty Port is fully utilized for the RORO vessel operations, connecting Roxas Port in Oriental Mindoro; Lo-oc in Romblon, and Batangas Port. It form part of the Strong Republic Nautical Highway (SRNH) which was launched on April 12, 2003. (3)

This so called nautical highway combines several provincial road leading to RORO Ports/Wharves connecting the Island of Luzon, Visayas, and Mindanao. It provide cheaper alternative in transferring of perishable goods, vehicles, and people (tourist and vacationers) as compared to costly liners and air transport.

Caticlan Jetty Port is managed by the Provincial Government of Aklan. It is currently implementing expansion project to be able to accommodate a million tourist visitors by 2013; their reclamation project includes reclaiming a 2.56 hectares of sea next close to the terminal itself. (4)

Caticlan Jetty Port Passenger Terminal building has two wings. The wing on the left side (facing the terminal) are used for ro-ro passengers bound for Mindoro and Batangas. Whereas on the right wing (again facing the terminal) are used by foreign/local tourist and aklanon residents boarding fast craft or motorized outrigger to Cagban Jetty Port.

Connecting both wings is the spacious lobby that houses Administrative offices, Medical Clinic, Shipping company offices, Information kiosk, and Baggage x-ray machine. For the convenience of the passengers, the terminal building are fully air-conditioned with cable television, and WI-FI connection while awaiting for the next boarding call.

Outside the terminal building is a ticketing booth for ro-ro vessels plying Caticlan-Roxas and Caticlan-Batangas  route,  another is the ticketing booth for fastcraft owned by Montenegro Shipping (started on August 8, 2008), and Oyster Ferry Boracay Transport; whereas booth/desk for  Boracay Transport Multi-Purpose Cooperative with 90 operator/boat member are all house just near the other booth. On the other hand, terminal (fee is 50 pesos), and environmental (fee is 70 pesos) booth can also be found near the ticketing booth. For short of cash, there are two ATM machines on the right wing. Beyond terminal premises are food establishment, drugstore, convenience store, buses and for hire vans to and from Iloilo city.

You may also find large passenger type motorized outrigger going to Lo-oc, Romblon in the leftmost part of the pier, outside the terminal premises.

RORO Schedule to and from Roxas Port please click  here: 2015 Updated Schedule


Reference: 

1. philippinelaw.com.info/statues/ra381

2. www.en.wikipedia.com/boracay

3. Socioeconomic Reports on Central Philippines, 7th July 2006 by Sec. Romulo Neri (Secretary of Socioeconomic Planning).

4. www.aklan.gov/ph